"The ECC is surrounded by facilities that had to continue to deliver healthcare without interruption. To put up a building of that excellence, magnitude and complexity in that environment, so close to current clinical services, and the level of communications that this has involved, is pretty outstanding."

Dr Angus Cooper, ECC Lead Clinician

This project involved the construction of a 10-storey Emergency Care Centre in the middle of the biggest teaching hospital campus in Europe. The site was surrounded on all sides by the existing A&E department, a children's hospital and a variety of other clinical facilities. It is an excellent example of Robertson's ability to deliver a large, complex project on a tight site in the heart of a live, operational working environment.

Within this extremely sensitive setting, and with up to 400 operatives on site at any given time, Robertson undertook major demolition, earthworks, piling operations and concrete formwork, with new retaining structures built immediately adjacent to occupied buildings in order to protect them during construction. The new building houses a state-of-the-art A&E facility along with all the supporting diagnostic arrangements.

"I have never worked on a building project that has been as successful as the one involving Robertson and ourselves for the Emergency Care Centre."

Richard Carey, then Chief Executive of NHS Grampian

We completed the £71.2m Emergency Care Centre project under budget and on programme, despite alterations to the original client requirements. In fact, £6m of additional works were delivered within the original contract date.

Some impressive figures accompany the completed project: The ECC contains enough plasterboard to clad the Empire State Building, flooring that could cover seven football pitches, 500 miles of wiring and 8000 light fittings!

The Centre (now officially named the Matthew Hay Building) has a gross internal floor area of 35,000m2 spread over eight floors, supported within a post-tensioned concrete frame superstructure on 550 concrete piles. Robertson developed an innovative approach to the construction of the building, switching from the proposed steel frame to a concrete solution. This reduced the overall building height and allowed us to use modular, prefabricated services installations.

 

Related news

  • Work underway in Backworth for 145 new h...

    Work underway in Backworth for 145 new h...

    Robertson Homes has begun construction of the 145 homes in Backworth, which marks its second foray into the North East.
  • Robertson Homes wins at Scottish Home Aw...

    Robertson Homes wins at Scottish Home Aw...

    We are delighted to announce that Robertson won two of the evening's most prestigious awards at the Scottish Home Awards.
  • Executive Chairman crowns ‘Ideal Candi...

    Executive Chairman crowns ‘Ideal Candi...

    Chairman Bill Robertson has announced the young winner of the Ideal Candidate Programme at Elgin Academy.

Related blog posts

  • Back to the floor: engineering apprenticeships

    Back to the floor: engineering apprenticeships

    Robertson Engineering Services Managing Director, Darren Clarke, meets with mechanical and electrical engineering apprentices.
  • A route in to modern apprenticeships

    A route in to modern apprenticeships

    Robertson’s Dundee office has seen various young people start apprenticeships and progress in their careers in the past few years.
  • The path forward from apprenticeships

    The path forward from apprenticeships

    Mike Turner originally started as a joiner on a 1-year YTS programme and is now Managing Director of Robertson Timber Engineering.